In brief: the Public Contracts Code (D.Lgs. 36/2023, in force since 2023, which replaced the earlier D.Lgs. 50/2016) governs, in Articles 94, 95 and 100, the grounds for exclusion and the participation requirements that also apply to subcontractors named in a tender — not only to the main economic operator. Naming a subcontractor that does not meet these requirements exposes the entire bid to the risk of exclusion, not only the single subcontracted work item.

Why it matters already at the tender stage, not only when the works begin

Unlike the solvency check that a contractor carries out in its own interest on a private subcontractor (see the dedicated guide), in public contracts the verification of the requirements of a subcontractor named in a tender is a formal step with direct consequences for the admissibility of the entire bid — an inadequate subcontractor is not only a future operational risk, it is an immediate risk of exclusion.

What Articles 94, 95 and 100 of D.Lgs. 36/2023 check, in brief

How to verify it concretely before naming a subcontractor in a tender

In addition to the formal documentation that the subcontractor itself provides (self-declarations, certificates), an independent check of its actual financial situation — balance sheet, protests, insolvency proceedings in progress — reduces the risk of discovering a problem only when the contracting authority verifies the requirements, when the award has already been made or is in progress, and the time left to replace the subcontractor is much more limited.

What this guide is not

Veryfy is not a law firm specialised in public contracts: our expertise is financial risk management. This guide does not replace a lawyer's advice on preparing tender documentation or on the formal assessment of the grounds for exclusion — it concerns the substantive financial verification that comes before, and complements, that formal assessment.

Before naming a subcontractor in a tender, the Veryfy report checks the balance sheet, the beneficial owner and negative records — a check that complements the formal documentation required by the Public Contracts Code.

Frequently asked questions

Do the requirements of the Public Contracts Code also apply to subcontractors named in a tender?

Yes: Articles 94, 95 and 100 of Legislative Decree no. 36/2023 (D.Lgs. 36/2023) govern the grounds for exclusion and the participation requirements that also apply to subcontractors named in a tender, not only to the main economic operator.

What risk does the bid face if the subcontractor named in the tender does not meet the requirements?

The entire bid risks exclusion, not only the single subcontracted work item. An inadequate subcontractor is an immediate exclusion risk, as well as a future operational risk.

Why verify a subcontractor named in a tender before it is formally indicated?

An independent check of the subcontractor's actual financial position reduces the risk of discovering a problem only when the contracting authority verifies the requirements, when there is much less time left to replace the subcontractor.